T. Tyler Potterfield Memorial Bridge Project

The city has been working with the state to clear woody vegetation near the Brown’s Island Dam. This work needs to be done before work begins on the T. Tyler Potterfield Memorial Bridge (TTPMB). In order to get to the dam, the contractor will need to prepare an access road.

Work began Nov. 18. In order to get to the dam, and to construct the access road, a fair amount of clearance was required. This clearance would have occurred anyway for the TTPMB. 

This is good news for those who have waited so long for the TTMPB to start…and shows real progress on the implementation of the Riverfront Plan.

•Brown’s Island Dam (BID) is regulated by the Dept. of Conservation and Resources, State of Virginia as a Low Hazard (Special Criteria) dam and therefore all woody vegetation within 25 feet of the structure is to be removed. Reference: Impounding Structures Regulations, 4VAC 50-20-10 et seq., including 4VAC 50-20-105, Virginia Soil and Water Conservation Board.

•The dam inspection report by DPU’s consultants Dewberry Consultants, LLC, 12/27/13 recommends the removal of woody vegetation and debris in the south section of the dam and along various piers.

•Requests for removal schedules by PDR were followed by DPU’s request to investigate the possible plan through DPU’s annual contracts.

•A draft drawing shows a tree removal plan that will benefit both the TTPMB project and meet the Low Head Dam requirements. It included a construction entrance that can be used by the successful BIDW contractor from day one to access the lower Southside site. It also includes the erosion and sediment controls required for the small amount of earth (460 square feet) that will be disturbed at the construction entrance. All trees are proposed to be chipped to the ground with no land disturbed. A safety fence adjacent to N-S tracks is shown as a precaution/boundary. DPU and PDR reviewed this plan.

•PDR worked with the TTPMB consultants, Hargreaves Associates, to approve the proposed tree removal routes and actions by G L Howard with comments that would require removal of the wood chips from the sites for future construction access. This would increase the cost and an agreement to spread the chips with future removal was reached.

•Work will begin with all permits in hand after November 18, 2014 and weather-permitting be finished by the end of the month. Work on the TTPMB will begin in earnest by the end of the year.

The Brown's Island Dam that the Potterfield Memorial Bridge crosses is classified as a low hazard dam by the State of Virginia. The state dam safety office thus requires the City of Richmond, the owner of the structure, to maintain a 25-foot clear zone free from woody vegetation around the dam. Clearing this vegetation is a state-mandated part of dam maintenance and Department of Public Utilities contractors will be completing it to fulfill State of Virginia dam safety requirements over the next month.

This required maintenance activity will also help support the construction of the T. Tyler Potterfield Memorial Bridge and paths. DPU contractors will be clearing the same pathway that the Potterfield Memorial Bridge will take in order to access the Brown's Island Dam and move machinery for the dam maintenance activity while limiting impact on the area. The clearing of vegetation in this area will help prepare the area where the elevated pathway for the Potterfield Memorial Bridge will be constructed over the next year. 

The Potterfield Memorial Bridge project has several important sustainability features, including: avoiding all impact to designated wetlands and the floodway, capturing run-off on site in bioswales, and improving water quality of run-off. Over 1,000 native ferns, shrubs, and trees will be planted as part of the project.

Monday, November 17, 2014

Why is my water cloudy and smelly?

Two of the most common calls our Water Plant water quality technicians receive is cloudy water complaints  and hot water that has a bad taste or smell.
Neither issue is one the city can correct. Cloudy water is caused by dissolved gases such as oxygen, nitrogen, argon, carbon dioxide, or hydrogen sulfide and the water looks cloudy only momentarily. The milky coloring is just air and the water clears when allowed to sit for a minute or two.

Water that has not been used for a period of time may have a taste and odor from sitting stagnant in the pipes. Run your tap for a few minutes when returning home if you’ve been away for more than 24 hours.

If the chlorine in water is unpleasant to you, place your drinking water in an uncovered glass container in the refrigerator at least overnight. This allows for the chlorine to dissipate at a faster pace. A container with a large opening works better. Another option is to boil tap water for five minutes, then allow it to cool. Then you won’t taste the chlorine.
 
The water from your water heater has all these gases and is under pressure, so when it comes out of the faucet, it might have a cloudy or milky appearance. It starts clearing up from the bottom to the top. It’s simply the tiny air bubbles rising. This is perfectly normal and it may happen more often at different times of the year. You don’t need to call the Department of Public Utilities unless the water hasn’t cleared up at all after five minutes.
 
Bad tasting or smelly hot water usually means the customer has an issue with their hot water heater that needs to be addressed. Most of the time, it’s sediment in the tank. Hot water heaters need to be flushed periodically to minimize tastes and odors. Follow all manufacturing recommendations outlined in your owner’s manual for properly maintaining your hot water heater.
 
It’s actually easy to do yourself.

For electric hot water heaters, shut off the power from the circuit breaker. If you use gas, shut the valve providing the gas supply. Next, turn off the cold water supply to the thank. It will be a valve near the bottom of the water tank. If you are not sure, feel the piping to see if it feels cool.

Near the bottom of the water heater is a drain valve. It may look like a small faucet or a round dial attached to a hose. If it’s a hose attachment, attach a garden hose tightly to it and put the other end of the hose out a window or in a sink or basement drain. If you have a faucet valve, you’ll need to drain it into buckets. You’ll need at least two, one to empty while the other is filling.

When the tank is empty, DO NOT turn the power or gas back on yet. That would be very bad and do great damage to your unit. Turn the water back on and fill up the water heater first. After it is full, then you can turn the power or gas back on. It will take awhile before the water gets hot again.

For more information, search YouTube for videos on how to drain hot water heaters.

Councilman Visits the Water Plant

The Water Plant hosted a visit from Councilman Jon Baliles, Nov. 5.

















Cleaned, treated water is almost ready to leave the plant and be sent to people's homes and businesses.


These massive pumps will send the water to various reservoirs and water towers around the city.



Water is constantly tested before it leaves the plant.


Each faucet represents a different water basin.